loading

One-Stop Services For Various Load Bank/EV Charger Pile Tester/Auto Testing Equipment/AC or DC Source Solution

100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 1
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 2
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 3
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 4
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 5
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 1
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 2
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 3
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 4
100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing 5

100-200kW 3 Phase AC Load Bank | Generator & Energy Storage Full Load Testing

✅3 Phase 0~400V Wide Input | Support generator, UPS & ESS witnessed acceptance test
✅ CR Load Mode | Simulate real resistive load for factory & site commissioning
✅ Multi Protection OCP/OVP/OTP | Protect your DUT from damage during testing
✅ Real-time Data Logging & Fault Record | Generate test report for project acceptance
✅ Mobile APP + Touch Screen Remote Control | Easy operation on site
✅ Multi-unit Parallel Support | Expand power to meet larger capacity testing
✅ CE Certified | Meets global export standards
5.0
design customization

    oops...!

    no product data.

    Go to homepage

    Product Description

    VILVA-RH series 100~200kW high-density programmable AC load bank is VILVA newly developed high-power test load equipment. It adopts innovative resistor technology together with new-generation high-speed large-air-volume cooling fans. With compact cabinet layout, its footprint is reduced by 50% vs traditional load banks.

    This programmable AC resistive load is designed for indoor power equipment acceptance test. It can simulate steady & step-changing load for diesel generator, UPS, energy storage system, to verify power output, temperature rise and stability of power supplies. Touchscreen control and full electrical protection are integrated. Multiple units support parallel connection for larger power testing requirements.

    A148
    A152

    Customer Power-on Pain Points & Solutions

    1. Pain Point:Traditional load bank is too bulky and takes up large workshop floor space, hard to move for indoor power-on acceptance test.
      Solution: Our VILVA-RH adopts high-density resistor and high-air-volume fan design. The cabinet size is reduced by half, compact and mobile with casters. It is convenient to deploy for indoor power-on burn-in and acceptance test.
    2. Pain Point: Unable to simulate real step/steady load during power-on test, can not fully verify power supply’s actual working performance.
      Solution: Programmable load function. It can set steady-state and step-changing load during power-on, simulating real working load to test generators, UPS and energy storage equipment. Check power output, temperature rise and stability under loaded power-on condition.
    3. Pain Point: Long-time unattended power-on test has high risk of overheating, over-current, which may damage the tested power equipment.
      Solution: Built-in multi-layer interlock protection including over-temperature, over-current, over-voltage & under-voltage. It triggers alarm and automatically cuts off load once abnormal signals detected, protecting both DUT and load bank during continuous power-on test.
    4. Pain Point: Single unit power capacity limited; hard to meet large power power-on commissioning requirements.
      Solution: Multiple VILVA-RH load banks can be synchronized and paralleled. Combine several units together to get higher total load capacity for large power system power-on acceptance.
    5. Pain Point: Manual recording of power-on test data, no standardized records for project handover and quality traceability.
      Solution: Real-time automatic data logging during power-on testing. Record voltage, current, power and temperature continuously. Export formal test reports for factory QC and EPC project acceptance.

    Product parameters

    Type

    Voltage

    Current

    Power

    VILVA-AC400V-100KW-RH

    3 PhaseAC0~400V

    144A

    100kW

    VILVA-AC400V-200KW-RH

    3 PhaseAC0~400V

    288A

    200kW

    Type

    VILVA AC400V 100KW RH

    VILVA AC400V 200KW RH

     

     

     

     

    Ratings

    Input

    Voltage

    3 PhaseA

    C0~400V

     

    Input

    Current

    144Arms

    288Arms

     

    Input

    Power

    100kW PF=1

    200kW PF=1

     

    Frequency

    40-6

    0Hz

    Voltage Sampling Accuracy

    ±(0.1%+0

    .2%FS)

    Current Sampling Accuracy

    ±(0.1%+0

    .2%FS)

    Frequency Accuracy

    ±0.

    5%

     

    Control Methods

    1.Local Touch S

    2. Ethernet Port:Touch Screen Rem

    3.Supply RS485 for

    creen Control

    ote Control/Phone APP(Android)

    Upper Control Using

    Control Power

    3 Phase AC

    380V/50Hz

    Wiring Method

    Copper busbar

    connection

    Air Outlet Mode

    Air intake on the right

    , Air outlet on the left

    Move Methods

    Wh

    eels

    Color

    Cabinet: RAL7015;Other RA

    L9003 Gloss level85% Briliant

    Protection Level

    Control Part

    SupportIP20

    Device Noise

    Noise≤85dB at 1

    m from air outlet

    Communication Interface

    RS485(Ethernet

    Port Optional)

    Dimension W*D*H(mm)

    W430*D680*760

    W520*D920*760

    Weight (kg)

    100

    140

    Contact Us
    To find the best products, just work with us.
    Take a look around our website. If you have a query or you need advice, just contact us. We'll take time to help you. If you require the top-quality products, feel free to contact us.
    sales@vilva-test.com
    +86 18128682585
    Related Products
    We focus on providing load bank,EV Charger Pile Tester,PV Invert Test,UPS Aging Test,PCBA test solution,Data collection and analysis solution,AC/DC source & load solution,Aging system test for various industries
    Contact Us
    Add: 2nd Floor, Building A2, Songhu Zhigu Industrial Park, Liaobu Town, Dongguan City, Guangdong, China
    Contact person: lisa
    Tel: +86 18128682585
    E-mail:sales@vilva.net
    Customer service
    detect