Welcome to Shenzhen Vilva Electronics Co., Ltd. official website!
Services Tel:

 +86-18122867790

Top Hits
PRODUCT
PRODUCT
CONTACT US


Phone :+86-18122867790   

TEl:+86-0755-27927879

E-mail:pm@vilva-test.com

           vilva@vilva-test.com

URL: www.vilva.net

https://vilva.en.alibaba.com

UPS test service
Product Category:Generator and UPS Test Service
Product Number:VILVA-UPS-CS
Product Brief:Testing purposes: This power detection service project will achieve the following test objectives: Identify whether the actual technical specifications of the UPS can meet the requ...
Hotline:

 +86-18122867790

Product Details
 
1. the purpose of testing:
This power detection service project will achieve the following test objectives:
Identify whether the actual technical specifications of the UPS can meet the requirements for use.
Test items and time required:

Serial number

Project

Time

1

Steady state test

 

2

dynamics test

 

3

Routine test

 

4

Other test

 

 

2.the project detailed and division of labor



Enclosure:
1.Steady state test

The load operation is approved by Party A and then loaded by Party B. The loading process is as follows:
        Step one, no load
        Step two, 50% rated load
        Step three, 100% rated load
        Step four, one phase is idling, the other two phases are 100% rated load
        Step 5, one phase 100% rated load, the other two phases are no-load
 
The parameter indicators that need to be tested in each process are as follows

Measurement content
Responsible party
Test parameters  Technical indicators (national standard) A B
Input power factor ø≥0.8 Coordination
Input frequency range  50Hz±2.5% Coordination
Output voltage waveform waveform distortion less than 5% Coordination
Output frequency ±0.2%
Output voltage  380V±2%
(The output voltage phase difference is kept at 4° during three-phase unbalanced loading) 
Efficiency  >75% Coordination
Noise (distance one meter) ≦65dB Coordination
 
2.dynamic testing
The load operation is approved by Party A and then loaded by Party B. The loading process is as follows:
Step1, no load, sudden increase of 100% rated load
Step 2, 100% rated load burst 0
Measurement content Responsible party
Test parameters Technical indicators (national standard) A B
Transient voltage —8%—+10%
Voltage recovery time 20ms
 
Step 3: Power supply mains conversion UPS
Measurement content Responsible party
Test parameters
Technical indicators (national standard)
A B
Power failure detection <20ms


Voltage waveform
±10%(1~2cycle) Coordination
 
3. routine testing
The load operation is approved by Party A and then loaded by Party B. The loading process is as follows:
Step 1, load 120% rated load for 10 minutes
Step 2, load 150% of rated load for 60 seconds
Step 3, battery discharge under 100% load
Measurement content
Test parameters Technical indicators (national standard) A A
Output voltage 380V±2%
Single cell voltage Pick out a set of other batteries Coordination
 
4.other tests (customized by Party A)

Contact Us

Shenzhen VILVA Electronic Technology Co. Ltd.

Business Address: 2nd Floor,Building A2,Songhu Zhigu R&D Center,Liaobu Town,Dongguan City, Guangdong Province, P.R.C

Factory Address: 2nd Floor,Building A2,Songhu Zhigu R&D Center,Liaobu Town,Dongguan City, Guangdong Province, P.R.C

Phone: +86-18122867790

Contact:Amy

Fax Number 086 0755 29768581

Wechat ID:shenzhenvilva

WhatsApp:+86-15814356357

Skype:live:809b341254f5b3b8

E-mail:  pm@vilva-test.com

             3525878530@qq.com

Order:UPS test service
* Indicates required
* Product Number:
* Contact: Name
* Phone:
E-mail:
* Intent to purchase:
Please fill out the procurement of products and product descriptions to facilitate our unity stocking further.

Battery di...

Generator ...

UPS test s...

Information
Home  | New Product  | Product  | Applications  | Case  | About Us  | News  | Contact Us
Copyright@ Shenzhen Vilva Electronics Co., Ltd. Copyright 2013 www.vilva.net 
tel:0086-755-27927879 fax:0755-29768581 Contact:Amy +86-18122867790  E-mail:pm@vilva-test.com
Add:2nd Floor,Building A2,Songhu Zhigu R&D Center,Liaobu Town,Dongguan City, Guangdong Province, P.R.C