Welcome to Shenzhen Vilva Electronics Co., Ltd. official website!
Services Tel:

 +86-18122867790

Top Hits
PRODUCT
PRODUCT
CONTACT US


Phone :+86-18122867790   

TEl:+86-0755-27927879

E-mail:pm@vilva-test.com

           vilva@vilva-test.com

URL: www.vilva.net

https://vilva.en.alibaba.com

Home > Product > Generator and UPS Test Service » Generator test service
Generator test service
Product Category:Generator and UPS Test Service
Product Number:VILVA-CS
Product Brief:
Hotline:

 +86-18122867790

Product Details
1.the purpose of testing:
This power detection service project will achieve the following test objectives:
● Whether the generator set can reach the rated power;
● Whether the steady-state loading capacity of the generator is up to standard;
● Whether the transient loading capacity of the generator set is up to standard;
● Whether the three-phase unbalanced operation capability of the generator set meets the standard;
● Whether the overload capacity of the generator set is up to standard (optional);
● Whether the indicators of the generator set have reached the "reciprocating internal combustion engine driven alternator set" GB/T 2820-2009;
● Identify potential safety hazards in the generator set in time to prevent problems before they occur.

 

2.the test project and the time require


Serial number Test projectT Test Time
1 Stablity test(逐级加载)  
2 dynamics test Three imbalance tests
 
Sudden drop test
 
3 3 routine test (full load 11 hours, overload 1 hour)
 
4 Other test  
 

3.the project detailed and division of labor

   

annex:
Note: Steady-state test, dynamic test, three imbalances, sudden drop test, routine test, other tests
1, steady state test
After the load operation is approved by Party A, it is loaded by Party B. The loading process is as follows:
Step 1: No load
Step 2: 25% rated load
Step 3: 50% rated load
Step 4: 75% rated load
Step 5: 100% rated load
2, dynamic testing
After the load operation is approved by Party A, it is loaded by Party B. The loading process is as follows:
3, three imbalances
Step one, phase A loading 50%, BC two phase no load
Step 2, phase B loading 50%, AC two phase no load
Step 3, C phase loading 50%, AB two phase no load
4, sudden increase test
Step 4, the load is increased by 0-100%
Step 5, the load is reduced by 100%-0
5, routine testing
After the load operation is approved by Party A, it is loaded by Party B. The loading process is as follows:
Step one, the load is gradually added to the full load
Step 2, continuous operation for 11 hours at full load
Step 3, overload (110%) running for 1 hour
6, other tests
Customized by Party A


 
Contact Us

Shenzhen VILVA Electronic Technology Co. Ltd.

Business Address: 2nd Floor,Building A2,Songhu Zhigu R&D Center,Liaobu Town,Dongguan City, Guangdong Province, P.R.C

Factory Address: 2nd Floor,Building A2,Songhu Zhigu R&D Center,Liaobu Town,Dongguan City, Guangdong Province, P.R.C

Phone: +86-18122867790

Contact:Amy

Fax Number 086 0755 29768581

Wechat ID:shenzhenvilva

WhatsApp:+86-15814356357

Skype:live:809b341254f5b3b8

E-mail:  pm@vilva-test.com

             3525878530@qq.com

Order:Generator test service
* Indicates required
* Product Number:
* Contact: Name
* Phone:
E-mail:
* Intent to purchase:
Please fill out the procurement of products and product descriptions to facilitate our unity stocking further.

Battery di...

Generator ...

UPS test s...

Information
Home  | New Product  | Product  | Applications  | Case  | About Us  | News  | Contact Us
Copyright@ Shenzhen Vilva Electronics Co., Ltd. Copyright 2013 www.vilva.net 
tel:0086-755-27927879 fax:0755-29768581 Contact:Amy +86-18122867790  E-mail:pm@vilva-test.com
Add:2nd Floor,Building A2,Songhu Zhigu R&D Center,Liaobu Town,Dongguan City, Guangdong Province, P.R.C