Lead time depends on the product type, configuration, quantity, customization requirements, and whether the required model is in stock. The lead-time for standard models is around 4 weeks, while customized units require approximately 8 weeks depending on solution complexity.
For customized load banks, the process includes requirement analysis, parameter calculation, R&D, production, assembly, commissioning, inspection, aging testing, calibration, and delivery. More complex electrical specifications, mechanical structures, control systems, or site requirements may therefore require additional time.
For accurate project planning, customers should provide the required voltage, power, load type, loading steps, quantity, customization requirements, and desired delivery date. VILVA can then confirm the applicable production schedule before the order is finalized.