loading

One-Stop Services For Various Load Bank/EV Charger Pile Tester/Auto Testing Equipment/AC or DC Source Solution

What control modes are supported by EV charger testing equipment?

2026-10-22

Control methods depend on the equipment model and system configuration. Local touch-screen control, host-computer software, Ethernet and RS485 are available for remote programmable control. The supporting software is provided free of charge.

For programmable load applications, VILVA supports manual programming, intelligent program control, and remote control. Parameters such as voltage, current, power, and power factor can be programmed to reproduce different load conditions, including linear adjustment, step changes, and sudden changes.

For automated production-line or laboratory applications, the control architecture can be configured around the customer's testing process and data-management requirements. The specific interfaces, communication protocols, software functions, and licensing terms should therefore be confirmed according to the selected equipment and project configuration.

What control modes are supported by EV charger testing equipment? 1

prev
What is the voltage, current, and power measurement accuracy of the equipment?
Are the test units portable or rack-mounted? What are their dimensions and weight?
next
Related questions
GET IN TOUCH WITH Us
We focus on providing load bank,EV Charger Pile Tester,PV Invert Test,UPS Aging Test,PCBA test solution,Data collection and analysis solution,AC/DC source & load solution,Aging system test for various industries
Contact Us
Add: 2nd Floor, Building A2, Songhu Zhigu Industrial Park, Liaobu Town, Dongguan City, Guangdong, China
Contact person: lisa
Tel: +86 18128682585
E-mail:sales@vilva.net
Customer service
detect